Efficient collaboration between brands and knitwear factories determines product development speed, quality, and cost control. From initial sampling to reorder fulfillment, each stage has critical control points.
Stage 1: Sampling
Sampling is the first and most critical step. Brands provide style images or reference samples. Key checks include fit accuracy, hand feel, color confirmation, and craft details. Linknit's sampling takes 7-10 days.

Stage 2: Bulk Production
Bulk production takes 20-26 days, covering yarn procurement, knitting, linking, washing, steam shaping, pressing, QC, and packing.

Brands can participate in mid-production inspections and pre-shipment verification.
Stage 3: Quality Acceptance
Quality confirmation uses AQL 2.5 standards covering size tolerance, appearance defects, color fastness, and pilling grades.

Stage 4: Reorder Efficiency
Reorders skip sampling, saving both time and cost with lower unit prices. Key checks include updating original specifications and confirming yarn inventory.
Linknit was founded in 2000 with a 2,000 sqm facility. Sampling 7-10 days, bulk 20-26 days, MOQ ~300 pcs. Contact us.
FAQ
Can changes be made after sample approval?
Post-approval changes incur additional costs. Submit all revisions before final sample confirmation.
Are reorder prices lower than first orders?
Yes, reorders save sampling fees and benefit from optimized yarn procurement and scheduling.
Can I check production progress?
Yes, brands can perform mid-production inspections or video confirmations.