Linknit factory yarn room — CMT knitwear processing requires advance yarn quality and shade confirmation

Brands buying their own yarn and only paying the factory for "processing" — this is called CMT (Cut-Make-Trim).

Sounds like a money-saver? Not necessarily. CMT saves the margin on yarn procurement but adds yarn quality risk, waste management pressure, and delivery coordination costs.

If you're considering the CMT model, this article helps you run the numbers.

Linknit computerized knitting workshop — CMT requires machine parameter adjustments based on yarn characteristics


1. What Is CMT (Cut-Make-Trim)?

CMT, or Cut-Make-Trim, is a model where the brand sources its own yarn and delivers it to the factory, which handles only the processing stages: knitting, linking, washing, pressing, and packaging.

Compare with full package production:

DimensionFull PackageCMT
Yarn procurementFactory handlesBrand handles
Yarn cost controlFactory has bulk purchase pricing advantageBrand purchases independently, price depends on volume
Yarn quality liabilityFactory bears responsibilityBrand bears responsibility (yarn issues not covered by factory)
Delivery coordinationFactory single-sourceTwo timelines (yarn procurement + processing) — risk at the interface
Best forFirst orders, small batches, convenienceLarge volumes, brands with existing yarn suppliers
Processing feeIncludes yarn margin, looks higher per unitProcessing fee only, lower unit cost but yarn is separate

2. Who Is CMT For?

✅ Brands That Should Use CMT

  1. High-volume brands (10,000+ pieces/year) — have bargaining power to buy directly from mills, potentially below factory prices
  2. Brands with stable yarn suppliers — long-term relationships ensuring consistent quality and batch uniformity
  3. Brands with特殊 yarn requirements — specifying a particular mill's yarn (e.g., Loro Piana, Johnstons of Elgin) that factories don't typically stock
  4. Reorder (repeat orders) — same style, same yarn with already documented parameters — CMT is efficient

❌ Brands That Should Not Use CMT

  1. First orders, new development — if the yarn hasn't been tested with the factory's process, don't take the risk of buying it yourself
  2. Small volume per style (< 500 pieces) — shipping and waste costs for self-purchased yarn don't add up
  3. Unfamiliar with knitwear craftsmanship — incorrect yarn selection or unclear specifications lead to disputes when problems arise
  4. Tight delivery schedules — CMT adds another supply chain link to manage; any yarn delay disrupts factory scheduling

3. 6 Core Considerations for CMT Processing

1. How to Calculate Yarn Quantity — Allow for Waste

The factory calculates required yarn using this formula:

Total yarn required = Net yarn per piece × Order quantity × (1 + Waste rate)

Standard waste rates for knitwear processing:

Process ComplexityReference Waste Rate
Simple plain knit (solid color, crewneck)3–5%
Jacquard / multi-color5–8%
Intarsia8–12%
Chunky gauge (3G/5G)5–10%
Fine gauge (12G+)3–5%

Make sure to confirm the waste rate with the factory at order confirmation and agree on "excess to be returned, shortfall to be replenished." If the factory says "we'll keep the excess as备用," you need to specify ownership of remaining yarn in the contract.

2. Yarn Inspection — Test Before Knitting

Don't put the yarn directly on the machines when it arrives at the factory. Run these checks first:

  • Yarn count confirmation: matches the tech pack?
  • Twist test: too much twist makes the feel hard; too little causes fuzzing
  • Color shade check: is there any shade variation between cones in the same batch?
  • Lot / batch number verification: ensure all cones are from the same production batch

3. Yarn Storage — Environment Matters

Yarn is a "living material" — storage conditions directly affect knitting results:

  • Constant temperature (20–25°C) and humidity (60–65%), avoid over-drying or moisture regain
  • Do not place directly on the floor to prevent moisture and mold
  • Store different color codes separately to prevent color contamination or mixing

Reputable factories provide dedicated yarn storage space. Brands can request the factory to provide a storage standards statement in the CMT contract.

4. Process Parameter Matching — Yarn and Equipment Compatibility

Not all yarns work on all flat knitting machines. Before purchasing yarn, best to ask the factory:

  • "What gauge range is this yarn suitable for?" (e.g., certain woolen-spun wool only works on 7G and above)
  • "Can your machines achieve the tension this yarn requires?"
  • "What is the washing shrinkage rate for this yarn? Do we need to adjust the pattern dimensions?"

Best practice: Send 1–2 kg of the yarn sample for trial knitting before bulk purchasing. Confirm the parameters from the trial, then proceed with bulk ordering.

5. Washing Validation — Post-Wash Results May Vary

The same washing procedure can produce different results with different batches of the same yarn type — firmer or softer hand feel, lighter or darker color, different shrinkage rates.

Therefore, each yarn type and each color needs its own washing test to produce a post-wash measurement report before proceeding to bulk production.

6. Contract Terms — Clearly Define Responsibility

CMT contracts should specifically address:

ClauseExplanation
Yarn quality standardsSpecify yarn count tolerance, twist range, colorfastness grade
Maximum waste rateFactory bears costs above this threshold
Ownership of excess yarnDoes surplus yarn revert to brand or factory?
Yarn-related quality issuesWho bears responsibility for defects caused by yarn (shade variation, breakage, feel deviation)?
Yarn replenishment clauseTimeline and cost sharing for insufficient yarn

4. CMT vs Full Package: Price Comparison

Assume 500 pieces of 7G pure cotton crewneck pullovers. Cost comparison:

Cost ItemFull Package (Factory Supplies Yarn)CMT (Brand Supplies Yarn)
Yarn cost (500 pcs × 0.3kg × RMB 60/kg)Factory includes in quoteRMB 9,000 (brand self-purchase)
Processing fee (knitting/linking/washing/pressing/packaging)RMB 35/pieceRMB 28/piece
Yarn shipping, inspection, storageFactory handlesRMB 500–1,000
Total cost per pieceRMB 35/piece(RMB 9,000 + RMB 14,000 + RMB 800) / 500 = RMB 47.6/piece

Wait — CMT is more expensive?

Yes — when the order volume per style is small, CMT not only doesn't save money, it actually costs more. Because:

  1. Brand self-purchased yarn doesn't get factory bulk discounts
  2. Processing fee is RMB 7/piece lower, but yarn cost is RMB 18/piece higher (factory bulk yarn price is about RMB 42/kg)
  3. There are additional shipping and inspection costs

CMT typically only saves money when a single style exceeds 1,000 pieces and the brand has its own yarn purchasing channel with prices 10–15% below the factory's bulk yarn price.


5. CMT Processing Workflow

StepActivityDuration
1. Process confirmationFactory confirms process parameters (gauge/density/washing method)1–2 days
2. Yarn trialBrand sends 1–2kg yarn for trial knitting2–3 days
3. Yarn procurementBrand bulk-purchases yarn per confirmed specification3–7 days
4. Incoming yarn inspectionFactory tests count/twist/shade/batch1 day
5. Sampling confirmationFactory produces PP sample with brand's yarn7–10 days
6. Bulk productionKnitting + linking + washing + pressing + QC18–25 days
7. Inspection and shipmentAQL sampling + metal detection + packaging2–3 days

The total CMT cycle is approximately 35–50 days, 3–7 days longer than full package — mainly due to the yarn procurement and inspection stages.

How is the yarn waste rate calculated in CMT?

Standard waste rate is 3–8% (depends on process complexity). Waste rate = (yarn input - yarn used in finished goods) / yarn input × 100%. Brands should agree with the factory on a mutually acceptable maximum waste rate in the contract — the factory bears costs beyond that. Our standard: solid plain knit 4%, jacquard 6%, intarsia 10%.

Can CMT handle brand care labels and packaging?

Yes. CMT only means "yarn is supplied by the customer." The factory can still complete the full range of hang tagging, care labeling, and packaging per brand requirements. These are part of the "Trim" in CMT and are standard factory services.

What happens if there is excess yarn?

The contract should specify how remaining yarn is handled: return to the brand (with the brand bearing shipping costs) or purchased by the factory at market price. We don't recommend letting the factory "keep it for future use" — if the next order with this yarn uses a different color batch, the retained yarn may become unusable.


CMT is not a shortcut to savings — it's a choice to take control of the supply chain.

For brands with high annual volumes and existing yarn supplier relationships, CMT can reduce costs and control yarn quality. For first-time cooperations or small volumes, we recommend starting with full package production to establish familiarity with the factory and process, then considering CMT later.

To discuss CMT pricing and cooperation details, contact us or review our customization services.